Outsourced Philippines guide
Build a knowledge base review cycle for a Philippine support desk
A help article that was correct last quarter can send an agent down the wrong path today. A review cycle gives every article an owner, a test, and a retirement decision.
A help article that was correct last quarter can send an agent down the wrong path today. A review cycle gives every article an owner, a test against real contacts, and a clear decision to keep, revise, merge, or retire.
On this page
Inventory the articles that support the queue
Start with the articles the agents actually open during a shift. Export the views, the searches, and the links from the queue. Add the articles that new agents are told to read in onboarding. The inventory should show the article, the owner, the last review, and the queues it serves.
Mark the articles that no longer have a queue or a product behind them. A page kept only because someone wrote it creates noise in search. Record the candidate for retirement and the reason. Do not delete on the first pass; give the owner a chance to confirm.
Set an owner and a review date
Every article needs a named owner who can approve a change. The owner may be a team lead, a product contact, or a senior agent. Record the name and the review interval. An article with no owner is a page that will drift until someone complains.
Set the interval by the rate of change in the subject. A billing process may change every quarter, while a password reset may stay stable for a year. Record the interval and the next date. The date should appear on the article and in the review queue.
Test the article against a real contact
Ask an agent who did not write the article to follow it on a recent contact. Watch where the agent hesitates or leaves the page. A step that requires knowledge outside the article is a gap. Record the contact, the gap, and the change needed.
Check the screenshots and the field names against the live system. A renamed button can make a correct process unusable. Record the version of the system and the date tested. A review that only reads the text will miss the interface drift.
Retire or merge stale content
Merge articles that answer the same question in different words. Keep the version with the clearer steps and redirect the other. Record the merge and the new owner. Duplicate articles split the search results and hide the better answer.
Retire an article when the process no longer exists or the risk is fully handled elsewhere. Archive it with a note and remove it from the agent-facing search. Record the decision and the date. A retired page should not reappear as a dead link in the queue.
Capture the review evidence
Store the reviewer, the date, the test contact, and the change with the article history. A later reviewer should see why a step was added or removed. Record the approval and the version that went live. The evidence is what makes the next review faster.
Report the review coverage each month: how many articles were due, tested, changed, and retired. A coverage number that stays low points to a capacity problem. Record the cause and the fix. The report should be short enough to read in a service meeting.
Review the cycle each quarter
Look at the searches that returned no useful article. Those gaps are the next articles to write or repair. Compare the top searches with the inventory. Record the missing topic and the owner.
Ask the agents which article they trust and which they avoid. Trust is a useful signal that a metrics review can miss. Record the feedback and change the review order. The cycle should improve the desk, not only the documentation score.
Sources and next steps
Use the operations support work lane as a practical starting point, then review the onboarding checklist before expanding the role.
